This project consisted of constructing a 6.0 MG prestressed concrete tank, along with associated piping, site civil work, asphalt drive, and site stormwater control.
The 20-Year Master Plan and Hydraulic Evaluation completed in 2003 by Hatch Mott MacDonald identified the long-term need to construct a water storage tank at the ECUA Carriage Hills Well site.